CMS Workspace
Questions, comments and requests should be sent to the alstone@fnal.gov
Last modified: Tue May 23 15:27:34 CDT 2006
Scripting
Notebook
Index
Archives
Home

Agenda Server
Calendar
FNAL ROC
iCMS
Glossary
HyperNews
IGUANA
LPC
News
SCRAM
TWiki
USCMS

ELOG
Emacs
Google
List Server
Pine

Scripting

This section was last modified on Mon Mar 27 10:18:30 CST 2006.

Notebook

This section was last modified on Tue Apr 18 09:32:24 CDT 2006.

See the FNAL CMS ROC ELog for detailed summaries.

To-Do

  • Revise ROC activity checklist with Kaori.

  • ROC access to CERN network.

  • Data catalogue of MTCC data.
Pending

  • 2006-03-28: Request to John Kent for: a) access holes for KVM cables, b) mounting LCD monitor, c) door stop for ROC, d) adjust closure on men's bathroom. ROC work has been passed to PPD (Leon Beverly).

  • 2006-03-22: Submitted requisition for new table for the ROC. Same style, 24"x72" dimensions, no modesty panel. Due to arrive Apr 20th.

Done

  • 2006-04-11: File server from Koi Computers has arrived. Includes three years on-site parts and labor.

  • 2006-04-10: Purchased and installed QuickTime Pro on the laptop.

  • 2006-04-06: Window and door blinds installed in my office.

  • 2006-04-05: Acrobat Standard 7.0 for Windows XP purchased and installed on the laptop.

  • 2006-04-04: Received pencil cups, laser pointers and a 36" wooden pointer for the ROC.

  • 2006-03-31: PPD Data Support Group installed Office 2003, Cygwin (kerberos & X-server), McAfee, VPN (for tracking, remote Windows access), and other required and/or standard products on my laptop.

  • 2006-03-29: Ordered new business cards.

  • 2006-03-29: Big screen TV for the ROC. Yurii Maravin from Kansas State Univ ordered a 42 inch Westinghouse LCD Monitor.

  • 2006-03-27: Received additional KVM extender cables (vendor VPI) for the ROC.

  • 2006-03-24: Moved bookshelf to ROC for neat storage of books, paper, binders, etc.

  • 2006-03-23: Registered laptop ALANCMSROC in the Fermi domain with DHCP. Installed Norton SystemWorks 2006, Zone Alarm Firewall, Spybot S&D,. Automated updates of Windows Security and Antivirus.

  • 2006-03-22: Ergonomic workstation review with Eric McHugh and Amber Larson. Eric sent around a few emails on shading, noise and chairs.

  • 2006-03-21: New Dell laptop arrived. Requisition for new laptop - Dell Inspiron 6000 was submitted on 3 Feb 2006. Follow-up on 28 Feb 2006, Terry Read sent a "High Priority" email to push the requisition to purchasing.

  • 2006-03-13: Received one 25 ft computer extension cable (video, keyboard, mouse) for the ROC, and video quality is unaffected. We want to move all the PC towers behind the false wall to provide more leg room under the tables and to improve the look of the ROC. Patrick and I worked out the numbers and lengths. We need a total of 18 cables in lengths from 15 to 35 ft.

  • 2006-03-08: Received electronic copy of ROC Floor Plan from Lisa Carrigan. Autocad drawing was done by vendor. Lisa updated with a current ROC configuration. Linked to ROC web page.

  • 2006-03-08: Received fax from Lisa Carrigan who generated a quote for a ROC table from Home Concepts. Same style, 24"x72" dimensions, no modesty panel.

  • 2006-03-02: Whiteboard mounted to wall in my office per request sent to John Kent.

  • 2006-03-01: Arranged with HVAC manager (Randy Sales) to disable the direct temperature control from the ROC thermostat. The setpoint is currently 70 F by software. The lowest available setpoint for our part of Wilson Hall is 68 F. Call x8031 if we have any problems.

  • 2006-02-17: Created HyperNews account. Subscribed to CERN Computing Announcements, Data Quality Monitoring Developments, Electronic Logbook Discussions, Visualization Discussion, Event Filter Development and Event Filter/DQM Announcements.

  • 2006-02-17: Obtained CERN computing and mail accounts. Faxed CMS registration form to CMS Secretariat (2 Feb 2006). Follow-up with CERN helpdesk (16 Feb 2006).

  • 2006-02-17: Fixed problem with pine taking 15 seconds from flxi02, flxi03 to connect to imapserver3, then rsh times out, and finally connects. Sent email to FNAL helpdesk, but they do not provide support for email applications. Found solution on CERN Mail FAQ under Pine rsh timeout. I changed rsh-open-timeout=0 in my .pinerc file in my home directory.

  • 2006-02-15: ROC Meetings are now part of the CMS Agenda Server.

  • 2006-02-15: Revamped ROC Web Page. Updated links. Simplified the html code. Revised mission statement. Added standard FNAL footer, archives, new photos, MTCC links, ROC Elog, Mailing list and Meetings. I plan to make this page the portal for users of the FNAL ROC.

  • 2006-02-10: Received office key (requisition submitted Jan 31st).

  • 2006-02-09: Created CMSROC mailing list. Kaori and I are list owners. Archived weekly. New member requests by owner. Archives and list members public. Private posting by list members.

  • 2006-02-08: CMS FNAL Remote Operations Center Logbook is now available. The first entry provides a brief overview for new users.

  • 2006-02-07: Joined USCMS mailing lists:  CMS_UAF_USERS, LPC-HOWTO, USCMS-ALL, USCMS-LPC.

  • 2006-02-06: Old email from Joe Boyd reminded me why I was having problems with 'setup' and 'pine' on fsui02.

  • 2006-02-03: Reconfigured .cshrc and .login files for FNALU cluster.

  • 2006-02-03: Electricians programmed hallway switch #6 to lights in office WH11W.

  • 2006-02-01: Discussed in detail with Shuichi Kunori the logbook options for CMS at FNAL. Many people are using KBook, which is based on the CRLW Logbook used by the DZero control room.

  • 2006-02-01: Transferred 10+ years of email folders to AFS, and configured with local version of Pine.

  • 2006-02-01: Created new web page on AFS.

  • 2006-01-31: Added to FNALU cluster.

  • 2006-01-31: AFS account created.

  • 2006-01-31: CMS account created.

  • 2005-01-30: Electrician replaced light bulbs in office WH11W.