Installation

Power Distribution

David L. Huffman

The typical installation for the distribution chassis is the lowest level of the relay rack. For BLS power the center rack has the chassis which powers the three rack system and can be seen in the bottom of rack PC17.

For the Preamp system there are two distribution chassis in the bottom of rack PW07.

The AC input plug is connected below the bottom of the rack. They are large 60Amp receptacles.