FNAL/NEU EMU Alignment ISR Photo Gallery

 

     The following pages offer several photos taken during the ISR Alignment Tests at CERN.  The photos show the general setup of the test area as well as a detailed view of each sensor.

 

 

Set 1 : First ISR Test 15 June – 22 June 2000

 

            Photos 1-2       -           Initial Setup and Testing

            Photos 3-4       -           Initial Setup and Testing

            Photos 5-7       -           Initial Setup and Testing

            Photos 8-10     -           Detail of Mab/Transfer Plate Final Configuration (Final Config)

            Photos 11-22   -           Detail of Individual Sensors along SLM and Axial Line (Final Config)

            Photos 23-26   -           Selected CERN ISR Photogrametry Photos

 

Set 2 : Second ISR Test (28 June – 4 Aug 2000)

 

            Photos are not labeled and are being posted from ISR hall as they are taken.  They will be

formatted in a manner to Set 1 sometime after the completion of the tests.

 

 

Available Photos from July / Aug ISR Test

 

 

 

Updated: 28 July 2000 by RL