C0 Lambertson Replacement

home.fnal.gov/~peterg/c0_lambertson_replacement

Peter H. Garbincius (8/5/02)
peterg@fnal.gov - (630) 840-3693

C0 IR Hall (21jan03) showing recently installed FMI dipoles replacing Abort Lambertson magnets.

C0 Punch List for last week of shutdown. plain text

Status of Major Shutdown Activities based on Dave Augustine's master schedule. EXCEL file

Schedule of Shutdown Activities based on Dave Augustine's master schedule - updated frequently. EXCEL file

Brief Project Description (plain talk and plain text)

project description with FY03 budget estimate and DOE-speak (September 19, 2002 - MS Word)

Schedule - upcoming meetings (invitees and agendas), events, deadlines, etc.

Minutes of previous meetings with ACTION ITEMS

Report of C0 Readiness Review - 11dec02 in two formats: .doc (MS Word) and .pdf (PostScript)

the Team - participants and backups (plain text).

Shutdown Shift - personnel assignments (PowerPoint file).

ES&H Documents Link to Work Permit and Notification Forms, Project Hazard Analyses, and other ES&H Documents.

Power Availability in Tunnel - two jobs remain: fix North flare 480 VAC 60 A disconnect, add 480V 30 A disconnect at South flare (plain text).

Alignment and Coordinates for FMI dipoles

Bus hookup - for existing Lambertson string, also showing LCW, cable trays, and support structure (30july02). See also 1780.003-MD-326363 (sheets 2 and 3 of 3).

FMI Dipole Assignments and Moves (EXCEL file).

c0_IR picture - showing abort elements (1999) shown above (.jpg)