CDF  Pictures

 

 

COT

 

q       Prototyping

*  Prototype

 

q       Boards Fabrication

*  Winding machine

*  Winding

*  Gluing the injection molded parts

    

q       End Plates Fabrication

*  Chuck at Brenner

 

q       Assembling

*  Gallows at NML

*  Inner cylinder and end plates 1

*  Inner cylinder and end plates 2

*  Struts

*  Pre-wiring

*  COT Assembled in the gallows

                                               

q       Flipping Fixture Test

*  Carpenter

*  Dave and Otto

*  Test frame

*  Load test

 

q       Flipping  

*  Inspecting

*  Flipping 1

*  Flipping 2

*  Flipping 3

                                          

q       Inserting Planes

*  Pre-tensioning

*  Preparing

*  Insertion machine – insertion side

*  Insertion machine – pulling side

*  Insertion 1

*  Insertion 2

 

q       Shipping from IB4 to B0

*  IB4

*  Preparing 1

*  Preparing 2

*  On the truck

*  Aseet, Bob and me

 

q       Installing

*  Spreader bar test

*  H-frame test

*  Insertion beam

 

         

CTC

*  Removing 1

*  Removing 2

*  Removing 3

*  Removing 4

 

 

________________________________________________

 

Home                                                 Legal Notices