| Job Title |
Job Description |
Requirements |
Job Status |
| Run Control |
Develop software to control the starting and
stopping of runs, communication with multiple
processes.
|
- Some experience in either C++ or java.
- Devote 30-40% of ones time to code developement
and testing.
|
Open |
| Global Connection Network |
Provide software to run NOvA simulated data through
the daq hardware.
|
- Some experience in either C++ or java.
- Devote 30-40% of ones time to code developement
and testing.
|
Open |
| General Software Development |
Develop software for NOvA DAQ systems. Fill in gaps where
software development is needed but not presently allocated
to an individual.
|
- Some experience in either C++ or java.
- Devote 30-40% of ones time to code developement
and testing.
|
Open |
| Job Title |
Job Description |
Requirements |
Job Status |
| Detector Integration, Proto-Side |
Assemble full scale mockup of near detector
side readouts and infrastructure. Model will include both detector
edge and associated building supports and structure, and prototype
infrastructure systems.
|
General assembly and gluing |
Open |
| FEB/DCM Testing Infrastructure
|
Fabricate a test setup that can hold
on the order of 64 front end boards in a small enclosure, along
with cabling to a readout DCM. Enclosure will need to be small
enough to either mount in a rack, or sit in Feynman at the NOvA
test stand. (we can't just have 64 front end boards laying around
over there during testing).
|
General assembly, some design work, access to a shop.
|
Open |
| DAQ/DCS computing farm installation/configuration
|
When the computing for the Near Detector on the
surface arrives, the correct operating system and support software will
need to be loaded and configured on the machines, and limited QA/QC burn
in testing will need to be performed. Proper DAQ specs, basee configurations,
and QA proceedures will be provided.
|
Some assembly required, general computing, general linux
system management.
Note: Anyone interested should start interacting with the DAQ group.
|
Open |
| Job Title |
Job Description |
Requirements |
Job Status |
| FEB test DAQ interface |
Responsible for setup/maintenance of the FEB
test stand DCM with a DAQ computer to act as a mini run control to control
the test sequence. Scripting of tests, hardware and software installation.
Expertise/training at the IPND installation may be of great value.
Extensive interface with the DAQ software and hardware groups, and
front-end board group is expected.
|
C++ and unix scripting experience helpful,
workload expected to have high peak efforts during startup of tasks.
|
Open |
| FEB test Database interface |
Responsible for analysis of data from test
sequences and database entries for ~12,000 FEBs at the FEB test stand.
Scripting of analysis suites and database entry is expected.
Expertise/training at the IPND installation may be of great value.
Extensive interface with the front-end board, databese, and possibly
calibration groups is expected.
|
C++ and unix scripting experience helpful,
workload expected to have high peak efforts during startup of tasks.
|
Open |